Welcome to PMConnection

     

Menu
· Home
· The Project Management Search Engine
· Exclusive Articles

Related Sites
There isn't content right now for this block.

Related Products
 

The AI Revolution in Project Management: Elevating Productivity with Generative AI



 
Microsoft Copilot

 
  
CAPM Exam Prep Training
  
 
 
A Guide to the Project Management Body of Knowledge: PMBOK 7th Edition 2021
  

 
PMP Project Management Professional Exam Study Guide
    
 

 
Microsoft Project Step by Step

  

 
Managing Enterprise Projects: Using Project Online and Microsoft Project Server

Actual Cost (AC): Search Results

Search Results for: Cost



Results in the term's title:

·  Actual Cost of Work Performed (ACWP)
·  Budgeted Cost of Work Performed (BCWP)
·  Budgeted Cost of Work Scheduled (BCWS)
·  Cost
·  Cost Baseline
·  Cost Budgeting
·  Cost Control
·  Cost Estimating
·  Cost Management Plan
·  Cost of Quality (COQ)
·  Cost Performance Index (CPI)
·  Cost-Plus-Fee (CPF)
·  Cost-Plus-Fixed-Fee (CPFF) Contract
·  Cost-Plus-Incentive-Fee (CPIF) Contract
·  Cost-Plus-Percentage of Cost (CPPC)
·  Cost-Reimbursable Contract
·  Cost Variance (CV)
·  Project Cost Management
·  Should-Cost Estimate
·  Actual Cost (Assignment)
·  Actual Cost (Resource)
·  Actual Cost (Task)
·  Baseline Cost (Task)
·  Cost
·  Cost / Use
·  Cost Breakdown Structure
·  Cost Objective
·  Cost Rate Table
·  Cost Variance
·  Fixed Cost
·  Fixed Cost Accrual
·  Estimate Costs
·  Control Costs
·  Activity Cost Estimates
·  Cost Aggregation
·  Cost Performance Baseline
·  Activity Cost Estimates
·  Actual Cost (AC)
·  Control Costs
·  Cost Aggregation
·  Cost Baseline
·  Cost Management Plan
·  Cost of Quality
·  Cost Performance Index (CPI)
·  Cost Plus Award Fee Contracts (CPAF)
·  Cost Plus Fixed Fee Contract (CPFF)
·  Cost Plus Incentive Fee Contract (CPIF)
·  Cost Variance (CV)
·  Cost-Benefit Analysis
·  Cost-Reimbursable Contract
·  Estimate Costs
·  Plan Cost Management
·  Project Cost Management
·  Cost Benefit Analysis
·  Actual Cost (AC)
·  Control Costs
·  Cost Aggregation
·  Cost Baseline
·  Cost-Benefit Analysis
·  Cost Management Plan
·  Cost of Quality (CoQ)
·  Cost Performance index (CPi)
·  Cost Plus Award Fee Contract (CPAF)
·  Cost Plus Fixed Fee Contract (CPFF)
·  Cost Plus incentive Fee Contract (CPiF)
·  Cost-Reimbursable Contract
·  Cost Variance (CV)
·  Estimate Costs
·  Plan Cost Management
·  Project Cost Management
·  Activity Cost Estimates
·  Allowable Costs
·  Benefit Cost Ratio (BCR)
·  Cost Forecast
·  Cost of Conformance
·  Cost of Non-Conformance
·  Direct Cost
·  Life Cycle Costing (LCC)


Results in the term's text:

·  Actual Cost (AC)
·  Actual Cost of Work Performed (ACWP)
·  Analogous Estimating
·  Baseline
·  Budgeted Cost of Work Performed (BCWP)
·  Budgeted Cost of Work Scheduled (BCWS)
·  Change Request
·  Chart of Accounts
·  Constraint
·  Control Account (CA)
·  Control Account Plan (CAP)
·  Cost
·  Cost Baseline
·  Cost Budgeting
·  Cost Control
·  Cost Estimating
·  Cost Management Plan
·  Cost of Quality (COQ)
·  Cost Performance Index (CPI)
·  Cost-Plus-Fee (CPF)
·  Cost-Plus-Fixed-Fee (CPFF) Contract
·  Cost-Plus-Incentive-Fee (CPIF) Contract
·  Cost-Plus-Percentage of Cost (CPPC)
·  Cost-Reimbursable Contract
·  Cost Variance (CV)
·  Crashing
·  Decision Tree Analysis
·  Discipline
·  Earned Value (EV)
·  Earned Value Management (EVM)
·  Estimate
·  Estimate at Completion (EAC)
·  Estimate to Complete (ETC)
·  Expected Monetary Value (EMV) Analysis
·  Firm-Fixed-Price (FFP) Contract
·  Level of Effort (LOE)
·  Monte Carlo Analysis
·  Parametric Estimating
·  Performance Measurement Baseline
·  Planned Value (PV)
·  Project Cost Management
·  Project Management Software
·  Reserve
·  Reserve Analysis
·  Risk Avoidance
·  Schedule Activity
·  Scope Change
·  Scope Creep
·  S-Curve
·  Should-Cost Estimate
·  Simulation
·  Three-Point Estimate
·  Threshold
·  Time and Material (T&M) Contract
·  Trend Analysis
·  Value Engineering (VE)
·  Variance Analysis
·  War Room
·  Work Breakdown Structure Dictionary
·  Accrual method
·  Actual Cost (Assignment)
·  Actual Cost (Resource)
·  Actual Cost (Task)
·  ACWP
·  BAC
·  Baseline
·  Baseline Cost (Task)
·  BCWP
·  BCWS
·  Calculated Field
·  Client Requirements Definition
·  Code
·  Cost
·  Cost / Use
·  Cost Breakdown Structure
·  Cost Objective
·  Cost Variance
·  CPI
·  Crosstab Reports
·  Crosstab Views
·  Custom Field
·  CV
·  Deliverables
·  EAC
·  Earned Value
·  Earned Value Analysis
·  Enterprise Outline Code
·  Entry Table (Resources)
·  Field
·  Fixed Cost
·  Fixed Cost Accrual
·  Graphical Indicators
·  Lifecycle
·  Material Resources
·  Objectives
·  Outline Code
·  Portfolio Analyzer
·  Project Objectives
·  Project Resources
·  Project Statistics
·  Project Summary Task
·  Publish
·  Quality Objective
·  Resource Center
·  Resource Graph View
·  Resource Usage View
·  Risk Mitigation
·  SPI
·  Standard Rate
·  Strategic Information
·  Summary Task
·  SV
·  Task Usage View
·  Time Objective
·  Updating Task Status Updates Resource Status
·  Value List
·  Variance
·  Determine Budget
·  Control Costs
·  Project Management Estimating Software
·  Vendor Bid Analysis
·  Activity Cost Estimates
·  Cost Aggregation
·  Cost Performance Baseline
·  Acquisition
·  Activity Cost Estimates
·  Actual Cost (AC)
·  Analogous Estimating
·  Bottom-Up Estimating
·  Change Log
·  Conformance Work
·  Contingency Reserve
·  Control Account
·  Control Costs
·  Cost Aggregation
·  Cost Baseline
·  Cost Management Plan
·  Cost of Quality
·  Cost Performance Index (CPI)
·  Cost Plus Award Fee Contracts (CPAF)
·  Cost Plus Fixed Fee Contract (CPFF)
·  Cost Plus Incentive Fee Contract (CPIF)
·  Cost Variance (CV)
·  Cost-Benefit Analysis
·  Cost-Reimbursable Contract
·  Crashing
·  Determine Budget
·  Estimate
·  Estimate at Completion (EAC)
·  Estimate Costs
·  Estimate to Complete (ETC)
·  Firm-Fixed-Price Contract (FFP)
·  Fixed Price with Economic Price Adjustment Contracts (FP-EPA)
·  Fixed-Price Contracts
·  Incentive Fee
·  Incremental Life Cycle
·  Independent Estimates
·  Iterative Life Cycle
·  Monte Carlo Simulation
·  Nonconformance Work
·  Parametric Estimating
·  Performance Measurement Baseline
·  Plan Cost Management
·  Predictive Life Cycle
·  Procurement Performance Reviews
·  Project Cost Management
·  Project Funding Requirements
·  Reserve
·  Reserve Analysis
·  Scope Change
·  Scope Creep
·  Simulation
·  Three-Point Estimate
·  Threshold
·  Time and Material Contract (T&M)
·  To-Complete Performance Index (TCPI)
·  Trend Analysis
·  Value Engineering (VE)
·  Work Package
·  Cost Benefit Analysis
·  Portfolio Performance Management Plan
·  Quantitative and Qualitative Analysis
·  Acquisition
·  Actual Cost (AC)
·  Analogous Estimating
·  Bottom-up Estimating
·  Contingency Reserve
·  Control Account
·  Control Costs
·  Cost Aggregation
·  Cost Baseline
·  Cost-Benefit Analysis
·  Cost Management Plan
·  Cost of Quality (CoQ)
·  Cost Performance index (CPi)
·  Cost Plus Award Fee Contract (CPAF)
·  Cost Plus Fixed Fee Contract (CPFF)
·  Cost Plus incentive Fee Contract (CPiF)
·  Cost-Reimbursable Contract
·  Cost Variance (CV)
·  Crashing
·  Determine Budget
·  Estimate
·  Estimate at Completion (EAC)
·  Estimate Costs
·  Estimate to Complete (ETC)
·  Firm Fixed Price Contract (FFP)
·  Fixed-Price Contract
·  Fixed Price with Economic Price Adjustment Contract (FPEPA)
·  Independent Estimates
·  Iterative Life Cycle
·  Parametric Estimating
·  Performance Measurement Baseline (PMB)
·  Plan Cost Management
·  Predictive Life Cycle
·  Project Cost Management
·  Project Funding Requirements
·  Reserve
·  Reserve Analysis
·  Scope Creep
·  Three-Point Estimating
·  Time and Material Contract (T&M)
·  To-Complete Performance Index (TCPI)
·  Work Package
·  Incentive Fee
·  Technical Debt
·  Intelligent Automation (IA)
·  Final Report
·  Activity Cost Estimates
·  Allowable Costs
·  Benefit Cost Ratio (BCR)
·  Burn Rate
·  Common Cause
·  Cost Forecast
·  Cost of Conformance
·  Cost of Non-Conformance
·  Direct Cost
·  Internal Rate of Return (IRR)
·  Life Cycle Costing (LCC)
·  Nonconformance Work
·  Triple Constraint
·  Value Analysis
·  Value Engineering
·  Vendor Bid Analysis


  


[ Return to Encyclopedia ]

[ Go Back ]
Encyclopedia ©


Copyright 2005-2025 PMConnection.com. All Rights Reserved.
http://www.pmconnection.com a
PHP-Nuke Copyright © 2005 by Francisco Burzi. This is free software, and you may redistribute it under the GPL. PHP-Nuke comes with absolutely no warranty, for details, see the license.
Page Generation: 0.26 Seconds