Bottom-up Estimating
A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimates are then aggregated into a total quantity for the component of work. The accuracy of bottom-up estimating is driven by the size and complexity of the work identified at the lower levels. Generally smaller work scopes increase the accuracy of the estimates.
Exclusive Articles Results here.
Research Center Results here.
The Project Management Search Engine Results here.
[ Go Back ]
PMBOK® Glossary Terms and Definitions (3rd Edition) Copyright © by PMConnection - (10064 reads) |